Building on the French side, a stone’s throw from Geneva
In Haute-Savoie, works are governed by the French Planning Code (Code de l'urbanisme) and the planning document that applies in the municipality. Every project starts there — zone, heights, setbacks, footprints, green spaces — and then comes the choice of the right authorisation: prior declaration (déclaration préalable) or building permit (permis de construire).
In Chaumont, the rehabilitation of a stone rural house is under way: keeping the old walls and opening the interior to the garden and the light.
Types of project
- Detached houses and villas, from the choice of plot to handing over the keys.
- Extensions and renovations, with the 150 m² threshold above which an architect is mandatory.
- Rehabilitation of old buildings: farmhouses, village houses, barns.
- Interior architecture and made-to-measure fittings.
The 17 municipalities of the Genevois
- Archamps
- Beaumont
- Bossey
- Chênex
- Chevrier
- Collonges-sous-Salève
- Dingy-en-Vuache
- Feigères
- Jonzier-Épagny
- Neydens
- Présilly
- Saint-Julien-en-Genevois
- Savigny
- Valleiry
- Vers
- Viry
- Vulbens
Frequently asked questions
Are the rules the same as in the Pays de Gex?
The Planning Code is the same — thresholds for prior declarations and permits, the architect requirement above 150 m², processing times — but the local planning document varies from one municipality to another.
Can an old farmhouse or stone house be renovated?
Yes. Rehabilitating an old building calls for a close look at what is already there and, often, a prior declaration or a permit, depending on the floor areas and façades altered.
Can I follow a project in France while living in Geneva?
Yes: meetings, application follow-up and site visits are organised on both sides of the border.