Building or renovating in the canton of Vaud
In the canton of Vaud, the building permit application goes to the municipal authority (municipalité), which puts it to public consultation (enquête publique) before ruling on it. So every project starts with the municipal regulations: zone, heights, distances, ratios, architectural appearance.
The application is then prepared with the drawings, cantonal forms and energy documentation, and followed through to the permit, before tendering and site supervision.
Types of project
- New villas with high energy performance, by the lake as well as inland.
- Renovation and alteration: extensions, additional storeys, interior reorganisation.
- Rehabilitation of old buildings: winegrowers’ houses, farmhouses, village houses.
- Interior architecture and made-to-measure fittings.
Municipalities by district
- Nyon
- Nyon
- Gland
- Rolle
- Coppet
- Prangins
- Arnex-sur-Nyon
- Arzier-Le Muids
- Morges
- Morges
- Aubonne
- Allaman
- Saint-Prex
- Préverenges
- Aclens
- Cossonay
- Ouest lausannois
- Renens
- Prilly
- Bussigny
- Chavannes-près-Renens
- Crissier
- Ecublens
- Saint-Sulpice
- Lausanne
- Lausanne
- Cheseaux-sur-Lausanne
- Epalinges
- Le Mont-sur-Lausanne
- Romanel-sur-Lausanne
- Lavaux-Oron
- Lutry
- Bourg-en-Lavaux
- Belmont-sur-Lausanne
- Chexbres
- Puidoux
- Oron
- Savigny
- Riviera-Pays-d’Enhaut
- Vevey
- Montreux
- La Tour-de-Peilz
- Blonay–Saint-Légier
- Veytaux
- Rossinière
- Aigle
- Aigle
- Bex
- Villeneuve
- Yvorne
- Ollon
- Leysin
- Gryon
- Ormont-Dessous
- Ormont-Dessus
- Château-d’Oex
- Gros-de-Vaud
- Echallens
- Assens
- Bercher
- Bottens
- Froideville
- Goumoëns
- Jorat-Mézières
- Montanaire
- Montilliez
- Jura-Nord vaudois
- Yverdon-les-Bains
- Grandson
- Sainte-Croix
- Vallorbe
- Chavornay
- Baulmes
- Bavois
- Chamblon
- Agiez
- Arnex-sur-Orbe
- Broye-Vully
- Payerne
- Avenches
- Moudon
- Cudrefin
- Faoug
- Grandcour
- Valbroye
Frequently asked questions
Do I need a permit to extend a house in the canton of Vaud?
In most cases, yes: the application is submitted to the municipal authority and put to public consultation. Some minor works may be exempt from consultation; the municipal authority decides depending on the project.
Can a Geneva architect handle a project in Vaud?
Yes: the design, the application and site follow-up are carried out in the same way, using the forms and regulations of the municipality concerned.
Can we communicate in Spanish or English?
Yes: meetings and project follow-up can be conducted in French, Spanish or English.